Concrete Cost Calculator

Use your project volume or dimensions together with your own supplier price to estimate concrete material cost. Delivery and other fixed fees stay separate and fully editable.

Your measurements

Calculated in your browser
Enter your supplier quote, not a regional average.
Advanced options Extra allowances & optional details
Optional allowance you choose. 0 means no extra; it is not a recommendation.
Try an example:Examples are not recommended dimensions or prices.

YOUR MATERIAL ESTIMATE

WidthLengthDepthDiameterDepth
Input measurements and units are shown on this schematic; not to scale.

A clearer quantity starts here.

Enter your measurements, check the units and calculate. Your result will include the assumptions and rounding steps.

THE WORKFLOW

How to use this concrete cost calculator

  1. Choose known concrete volume or enter project dimensions; confirm the units.
  2. Enter your supplier price and matching volume price basis.
  3. Add optional waste, delivery and other fixed fees; calculate material cost and total estimate.

Formula & assumptions

Material cost = order volume × entered price in matching volume units. Total = material cost + delivery + other fixed fees.

Prices and fees are supplied by you. USD is a display convention, not a pricing database. Labor, reinforcing, base, excavation, pump rental and tax are not automatically included.

See methodology and sources →

AN ARITHMETIC EXAMPLE, NOT A RECOMMENDATION

Worked example

Example only: 2 yd³ at an illustrative entered $150/yd³, plus $50 delivery. This is not a market price.

$350Estimated material + fees
  • Net volume2 yd³
  • Order volume2 yd³
  • Order volume54 ft³
  • Order volume1.529 m³
Example calculation

Extra: 1.52911 m³ × (1 + 0 / 100) = 1.52911 m³. Conversion: divide m³ by 0.764554857984 to obtain yd³.

Material: 2 yd³ × $150/yd³ = $300. Add entered fees $50 = $350.

Common questions

Does this include installation?

No. It includes concrete material and the fixed fees you enter. Labor, equipment, reinforcing, base and tax are not added automatically.

Where does the price come from?

You enter it from your quote or planning assumptions. We do not maintain current or regional price data.

Estimates only. Verify measurements and manufacturer packaging/yields. Project conditions vary. This tool does not provide structural engineering advice. Read the disclaimer.